New Product Galvanized Steel Roller Shutter Slats Forming Machine

New Product Galvanized Steel Roller Shutter Slats Forming Machine

new merchandise galvanized metal roller shutter slats forming device

  This Employed Galvanized Steel Roller Shutter CZPTs Car Roll Forming Machine For Sale makes use of galvanized metal sheet, coloured armor plate or aluminum plate as the substance plate. The merchandise produced by this equipment are vivid in coloured, against fading, resistant to rust, and be commonly utilized in shops, operating departments, warehouses, and fire partition. Its power is a few moments increased than aluminum alloy doorway.

2.Equipment technological parameters
 

Ideal Materials Materials GI, PPGI, PPGL
Width as drawing 
Thickness 1 mm
Substance of rollers High quality 45# cast steel, floor tough chromium plating
Rows of rollers twelve stations
Substance of shafts High quality 45# cast metal
Diameter of shafts fifty five mm
Materials of slicing blade Cr12 Heat Treatment
Pace ten-15 m/min
Aspect plate thickness sixteen mm
Chain dimensions 1 inch
Whole energy four kw
Voltage 380V 50HZ 3Phase
Visual appeal measurement (About) 4500mm*800mm*1500mm
Bodyweight(About) two tons
Duration measurement Encoder
Management manner PLC
Functioning manner Button + Contact screen

3.Some machine pictures for your reference. 

Packing and shipping details 
Normally the  Utilized Galvanized Metal Roller Shutter CZPTs Automobile Roll Forming Device For Sale can be packed into a single 20′ feet container or 40′ ft container. We have good romantic relationship with the transport agent. Either you can discover the shipping and delivery line at your aspect or we can assist you.

 

Manufacturing Process:

Uncoiling→ Feeding material into machine →Roll forming → Car reducing →Products receiving

Packing Technique

Principal device is packaged with plastic movie

Transportation

All machines need one 40 feet container to keep

Payment Term 

thirty% deposit by T/T in progress and 70% harmony after inspection affirmation just before shipment.

Shipping Time

Within 45 days after obtaining deposit.

Warranty

Two years, and we will provide complex assistance for wholelife of the equipment.

If some components of device damaged within 2 year, we will give customer the spare components for free. (consist of chain, bearing, roller,oil pipe, counting wheel) If far more than 2 year, probably some spare elements want to be charged. If machine can not operate effectively, we can instruct them on-line until finally the machine is perfect. If you need to have, we can go to your area to assist you. But you need to offer the expense of the engineer.(plane ticket, foodstuff, hotel and for each day eighty$ income)

we also sales all kinds of color steel coils 

Some FAQ:
Q1. What is actually your payment conditions and shipping time?
A1: 30% as the deposit by T/T in advance, 70% as the harmony payment by T/T following your examine the device well and prior to shipping. Of program your payment conditions are satisfactory.

Right after we get down payment, we will set up creation. About 30-45 times for delivery.

Q2. Do you have soon after-product sales assistance?
A2: Sure, we are satisfied to give suggestions and we also have expert experts CZPT throughout the globe. 

Q3. Do you promote only common machines?
A3: No, most of our devices are constructed according to clients specifications, making use of leading model components.
This fall. What will you do if the equipment is broken?
A4: We supply twelve months free warranty and free specialized support for the complete life of any machine.
If the broken parts cannot mend, we can ship the new parts replace the damaged components freely, but you require shell out the express cost by yourself. If it is beyond the warranty period, we can negotiate to resolve the difficulty, and we source the technical help for the total life of the tools.

Q5. Can you be dependable for transportation?
A5: Yes, remember to notify me the location port or tackle. we have abundant experience in transporting.

Q6. How to check out your organization?
A6: 1) Fly to ZheJiang airport, By large pace practice From ZheJiang Nan to HangCZPT Xi (one hour).
       2) Fly to ZheJiang Airport: By substantial velocity train From ZheJiang Xihu (West Lake) Dis.ao to HangCZPT Xi(four.5 hrs), then we can choose up you.

 

 

New Product Galvanized Steel Roller Shutter Slats Forming Machine